28.000kg SY235C8I2K.3A-7A Excavator Bucket Pins For Bucket-Bucket Rod Connection

Place of Origin China
Brand Name Wearproof
Certification ISO
Model Number SY235C8I2K.3A-7A
Minimum Order Quantity 1 piece
Price Negotiable
Packaging Details wrapping
Delivery Time 2-8 work days
Payment Terms L/C, T/T, Western Union
Supply Ability 10000 pieces per month

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Headline 28.000kg SY235C8I2K.3A-7A Excavator Bucket Pins For Bucket-Bucket Rod Connection Part Number 11904437
Model Number SY235C8I2K.3A-7A Part Weight 28.000kg
Size 85×85×570mm Use Sany SY235 Excavators
Leave a Message
Product Description

28.000kg SY235C8I2K.3A-7A Excavator Bucket Pins For Bucket-Bucket Rod Connection

 

Product Details                                                                                                                                              


 

42 Cr steel as raw material

38°—42° HRC hardness

Accept customized products

Exquisite and strong packing

Over 20 years experience

Small quantity acceptable

Sample available

OEM workable

 

Product Parameters

 

Headline 28.000kg SY235C8I2K.3A-7A Excavator Bucket Pin For Bucket-Bucket Rod Connection Brand Wearproof
Part Number 11904437 Model Number SY235C8I2K.3A-7A
Type SY235 excavator pins Product Feature steel
Part Size

85×85×570mm

Applicable Excavator Sany SY235 Excavators
Hue silver Place of Origin China
Stock 2500 pcs a week Port of Dispatch Shanghai
Product Features durable Samples yes
Warranty 52 weeks

Part Weight

28.000kg

 

28.000kg SY235C8I2K.3A-7A Excavator Bucket Pins For Bucket-Bucket Rod Connection 0


Product Processes

 

There are 7 processes for making a bucket pin

1.cutting ——2.forging ——3.rough machining ——4.quenching and high temperature tempering treatment ——5.finishing ——6.surface hardening, low temperature tempering treatment ——7.grinding

 

Product Operating Principe

 

Furnace installation: when installing the furnace, try to put the round steel of similar thickness into a furnace. The distance between the round steel and the heating resistance wire on both sides is more than 80mm, and the distance between the back end of the round steel and the furnace wall is more than 150mm. If the front end of the round steel is more than 200mm from the furnace door, if the thick and thin round steel is mixed, according to the principle, thin axis will be put on the top and thick axis will be put on the bottom. When it comes out of the oven, the thin axis comes out first, then the thick axis.

 

Packing and Shipping

 

For pins and bushings, a plastic bubble film and a cardboard box are provided to pack goods, which is easy to transport and helps to keep the products intact during transportation.

 

For leadtime, 10000 pieces are produced per month, which is a large stocks.

 

For shipping time, every goods will be sent to customers in time. Although shipping time is up to express company, we know an approximate time from different express company, and we will count it into the delivery time. So, our customers could get a precise deadline.

 

Services

 

20- year experience in construction machinery industry.

service is attentive.

no customer complaints, no bad comments.

goods can be returned or replaced without any reason within 7 days.

goods can be replaced within 15 days.

warranty is one year.

goods has samples.

 

FAQ                                                                                                                                                                                     



Q1: Are you trading company or manufacturer?
A: Our management is focused on exporting activities for more than ten years and we have our own bushing factory. Warmsun is always professional and reliable. Our advantages are multiple resource integration, strong quality assurance and excellent service level. We are always responsible for our products.


Q2: Hong long is your delivery time?
A: It depends on the quantity. For a big order, the time is generally 10-25 days after order. For a small order, customers can get goods at once.

 

Q3: Do you produce samples? Is it free or extra?
A: For standard products, we produce samples free of charge for our customers. And the express costs will be burdened by the customer, but can be returned after the order is placed. For some goods that are inconvenient to transport, the express costs will be burdened by the customer

 

Q4: How to ensure the quality?
A: We produce as per the confirmed technology or drawings for each order for our customers. And our factory has a strict quality control system. We inspect goods during production according to a certain frequency and we also perform the final inspection before the goods are packed.