B222100000412 30830-11100 SY135 Excavator Air Prefilter For SANY

Place of Origin China
Brand Name Warmsun
Certification ISO
Model Number Excavator Filter
Minimum Order Quantity 1 piece
Price Negotiable
Packaging Details cardboard case
Delivery Time 1-7 work days
Payment Terms L/C, T/T, Western Union, Trade Assurance
Supply Ability 120,000 pieces per year

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Part Name 30830-11100 SY135 Excavator Air Prefilter Part Number B222100000412
Model Number 30830-11100 Appalication SY135
Highlight

30830-11100 Excavator Air Prefilter

,

SY135 Excavator Air Prefilter

,

B222100000412 Excavator Air Prefilter

Leave a Message
Product Description

B222100000412 30830-11100 SY135 Excavator Air Prefilter For SANY

 

Product Details                                                                                                                                                                                                       


B222100000412 30830-11100 SY135 Excavator Air Prefilter For SANY 0

 

Check

When the pressure gauge of the filter element alarms or indicates abnormal pressure, it is necessary to check whether there is any abnormal phenomenon of the filter. If there is, it must be replaced.

When there is leakage or fracture deformation on the surface of the filter element, it is necessary to check whether the filter is abnormal. If so, it must be replaced.

 

 

Services

 

1. Pre-sale service :
Provide you best products price you need.
Answer all your questions about the products patiently.


2. Medium-sale service :
All filter element will be tested before shippment. 
Provide you newest goods transport conditions until you receive our products. 


3. After-sale service :
Technical advisory for any time. 
If the products have quality problem , and because of us , we will make the new products to you.

 

Packing and Shipping

 

1.According to orders, pack the spare parts one by one by oil paper
2.Put them into small carton boxes one by one
3.Put the packed small carton boxes into bigger carton boxes one by one
4.Put the bigger carton boxes into wooden boxes if necessary especially for the shipments by sea
5.Goods is packed by oil paper and plastic bags inside
6.Using wooden case package
7.We support the custom-made demand for package

 

Ordering Advice

 

Part Number

Size

Type  

Pictures 

Packing Requirement

Specific parameters or drawings, If the product needs to be customized

Other Requirement

 

FAQ                                                                                                                                                                                                

 

Q1: Are you trading company or manufacturer?
A: Our management is focused on exporting activities for more than ten years and we have our own bushing factory. Warmsun is always professional and reliable. Our advantages are multiple resource integration, strong quality assurance and excellent service level. We are always responsible for our products.

 

Q2: Hong long is your delivery time?
A: It depends on the quantity. For a big order, the time is generally 10-25 days after order. For a small order, customers can get goods at once.

 

Q3: Do you produce samples? Is it free or extra?
A: For standard products, we produce samples free of charge for our customers. And the express costs will be burdened by the customer, but can be returned after the order is placed. For some goods that are inconvenient to transport, the express costs will be burdened by the customer

 

Q4: How to ensure the quality?
A: We produce as per the confirmed technology or drawings for each order for our customers. And our factory has a strict quality control system. We inspect goods during production according to a certain frequency and we also perform the final inspection before the goods are packed.

 

Q5: What kind terms of payment can be accepted?
A: For terms of payment, L/C, T/T, D/A, D/P, Western Union (can be) could accepted

 

Q6: What certificates are available in Machinery?
A: For the certificate, we have CE, ISO, EPA(USA)CCC,

 

Q7: What about the warranty time?
A: 12 months after shipment or 2000 working hours, whichever occuts first.

 

Q8: What about the Minimum Order Quantity?
A: The MOQ is 1 pcs.